top of page
Form & Function
This project visualizes the relationship between form and function in architecture. The objective is to take a bridge and transform it into a movable bridge using analogies of house hold items. 
The requirements for this project are:
- 190' bridge span.
- Movable components to allow a 30 x 40 object to pass through.
- No part of the bridge could enter in the water.
- Water is 10' below the road.
- Membranes no longer than 20' or higher than 100' 

PROTOTYPES

Screenshot (7).png

Arch

HOWRAH
Screenshot (8).png

Cantilever

BLADEN COUNTY
Screenshot (10).png

Truss

ANALOGIES
Screenshot (4).png
WRENCH
Screenshot (22).png
Screenshot (5).png
Screenshot (23).png
ICE CREAM SCOOP
Screenshot (17).png
UMBRELLA
Screenshot (24).png
3 X 3
Screenshot (26).png
PRELIMINARY DESIGN
Screenshot (35).png

Closed 

Screenshot (43).png

Open

a.gif
TRANSFORMATION
TT1.gif
FUNCTIONAL MOVEMENT
o.gif
3D ELEVATIONS

FRONT ELEVATION

MOVEMENT

MOVEMENT

3D VIEWS
bottom of page